Introduction
Wide-ranging changes to the rules and prescribed sale and purchase documents for licensed residential developments will take effect on 31 December 2026. These revisions are the most significant change to Singapore’s residential sales framework since 2016. They place real weight on pre-sale disclosure and move defects, plan compliance and compensation risk further onto developers. Developers with ongoing projects, as well as those planning to launch residential projects on or after 31 December 2026, should take note of these changes.
These changes were announced by the Controller of Housing (“COH“). Introduced through the Housing Developers (Amendment) Rules 2026, these revisions form part of a broader package of amendments to the Housing Developers Rules (“HDR“). The amendments generally take effect on 31 December 2026, while the new requirements on maximum maintenance charges apply only to projects for which applications for planning permission are made on or after 1 June 2027. Corresponding amendments have been made to the prescribed forms for executive condominiums (“ECs“) under the Executive Condominium Housing Scheme (Amendment) Regulations 2026.
This Update covers: (1) the background to, and history of, the HDR and the prescribed forms regime; (2) the key revisions to Form 2 (Option to Purchase (“OTP“)), Form 4 (Sale and Purchase Agreement for non-strata housing) and Form 5 (Sale and Purchase Agreement for strata housing) (collectively, the “SPA“), distinguishing codified pre-approved amendments from genuinely new changes; (3) other revisions to Form 1, Form 3 and the HDR that developers’ sales, marketing and technical teams must operationalise; (4) the EC prescribed forms; and (5) next steps.
Eight key takeaways are set out in the Annex.
(A) Background and History
Legislative Purpose and Prescribed Forms Regime
Made under the Housing Developers (Control and Licensing) Act 1965, the HDR protects purchasers of uncompleted private residential properties by requiring licensed developers to disclose key property information and use prescribed OTP and SPA forms. These forms contain mandatory purchaser protections and may be amended only with the COH’s written approval or as the forms themselves permit; unauthorised SPA amendments are null and void (rules 10(3), 12(3) and 12(4) HDR). The courts have recognised the regime’s protective purpose: it regulates developers’ performance and guards against purchaser exploitation by restricting the parties’ ability to depart from the prescribed terms.
Previous Rounds of Revisions
- 2012: The Housing Developers (Amendment) Rules 2012, in force from 18 May 2012, re-designated the forms as Forms 1 to 5, recast the advertising rules, provided that the OTP is to be granted upon acceptance of the booking fee, and confirmed that the OTP may be amended only with the COH’s written approval or as the form permits.
- 2016: Further amendments took effect on 1 April 2016, and Forms 4 and 5 were replaced in their entirety by the Housing Developers (Amendment No. 2) Rules 2016 with effect from 1 August 2016. Those are the SPA forms now being replaced.
- 2023: The Housing Developers (Amendment) Rules 2023, in force from 28 June 2023, introduced the requirement to give intending purchasers notice of the documents needed for customer due diligence before accepting the booking fee (rule 10(4)(aa) HDR).
- Pre-approved amendments: Between these rounds, the COH has adjusted the forms by circular. Examples include pre-approved amendments permitting payment by FAST, MEPS and GIRO (9 April 2020), a pre-approved OTP clause voiding the OTP where customer due diligence cannot be completed (28 June 2023), and licence conditions restricting the re-issue of OTPs to the same purchaser (28 September 2020).
Why This Round Matters
This is the first wholesale rewrite of the SPA forms in a decade. It follows extensive consultation with industry and the public. It goes beyond modernisation: it moves risk to developers on defects, plan compliance and compensation, makes the plans and track record information given before booking a source of legal obligation, and introduces a binding cap on maintenance charges.
(B) Key Revisions to the OTP and SPA
The revisions are discussed in three groups: existing provisions incorporated or refined in the prescribed forms; new substantive changes; and the expanded miscellaneous provisions. The first group includes both previously pre-approved amendments and refinements to existing clauses, rather than wholly new requirements. The miscellaneous provisions are considered separately because, although many reflect wording previously routinely approved by the COH, some introduce additional obligations.
Codification of Pre-approved Amendments
- Customer due diligence: codification with refinements. New clause 2.9 of the OTP incorporates the voiding clause pre-approved in June 2023. The mechanism remains that the OTP is null and void if the Vendor is regarded as unable to complete, or chooses not to complete, customer due diligence under the Housing Developers (Prevention of Money Laundering, Proliferation Financing and Terrorism Financing) Rules 2023, with the booking fee refunded without interest. The new wording expressly cross-refers to rules 4(2) and 4(4) of those Rules and extends the purchaser’s withdrawal obligation beyond caveats to encumbrances.
- Electronic payment: codification of pre-approved methods. Payment by FAST, MEPS and GIRO, pre-approved in April 2020, is now incorporated into clauses 1.1 and 4.3 of the OTP and clause 5.9 of the SPA.
- Third-party rights: incorporation of previously accepted wording. Clauses excluding rights under the Contracts (Rights of Third Parties) Act 2001 are now included in the OTP and SPA. These reflect wording the COH has accepted as a standard amendment.
Genuinely New Changes
- Electronic communications: Under the OTP, the Vendor may send documents or communicate by email only if the purchaser (or its solicitor) has given written consent and designated an email address. The purchaser must monitor that address until the executed SPA is returned or consent is withdrawn. Emails are deemed delivered the same working day if delivered by 5 p.m., and otherwise on the next working day. The SPA now also provides for service of notices by email.
- Purchaser particulars and disclosures: The OTP now captures each purchaser’s nationality, residency status and email address, and, for entities, the Unique Entity Number and place of incorporation. The Vendor must disclose the reversionary owner and annual ground rent (if any).
- Foreign purchasers: If approval under the Residential Property Act 1976 is not obtained within the application period, the purchaser receives a full refund only if, within two weeks after the period expires, it gives the Vendor evidence that an application was made in time and was refused. The Vendor then refunds within four weeks. Otherwise, the Vendor refunds all moneys less 25% of the booking fee within six weeks after the application period expires.
- Risk: Under the amended SPA, risk remains with the Vendor and passes to the Purchaser only on the date the Purchaser actually takes possession of the Property or Unit. Previously, risk passed on the earlier of actual possession and the 15th day after the Purchaser received the Notice of Vacant Possession.
- Expanded definition of defects: Under the amended SPA, the relevant definitions now expressly cover faults arising from construction that does not comply with the Specifications and Plans, rather than the Specifications alone. “Plans” includes the Approved Plans and Floor Plan and, for Form 5, the Site Plan. Form 5 also introduces separate definitions of “Unit Defect” and “Common Property Defect”, collectively defined as “Defect”.
- Defects liability and maintenance charges: The defects liability period (“DLP“) and the purchaser’s liability for maintenance charges now both begin on the earlier of (i) actual delivery of vacant possession, and (ii) the 35th day (previously the 15th day) after the purchaser receives all the item 3 documents (the “DLP Commencement Date“). The DLP for individual units remains 12 months.
- Common property DLP and stakeholding (Form 5): The Common Property DLP ends 12 months after the DLP Commencement Date or, if the first Annual General Meeting (“AGM“) is held more than six months after that date, six months after the first AGM. The “Final Payment Date” is now the expiry of the Common Property DLP, so the 5% held by the Singapore Academy of Law may be retained for longer. The deadlines for notices of deductions run separately for unit defects and common property defects. Once formed, the management corporation may carry out rectification of common property defects, and the cost may be deducted from, and apportioned across, the stakeholding sums of participating purchasers.
- Compliance with plans: “Plans” now means the plans approved by the Commissioner of Building Control together with the Floor Plan and (for Form 5) the Site Plan given to the purchaser before the booking fee is collected. The Vendor must build in accordance with all of them. Authority-required changes may now be made without the purchaser’s consent only if they result from new guidelines, requirements, rules or regulations implemented after the OTP was granted. The list of key common property facilities for which substantive changes are restricted has been expanded.
- Annulment for substantive changes: Where the Vendor annuls following a purchaser’s objection to a substantive change, the Vendor must refund the booking fee and all amounts paid by the Purchaser to the Vendor pursuant to the SPA (“Paid Amounts“), pay an amount equal to the ad valorem stamp duty (subject to whether the purchaser obtained a refund from the Inland Revenue Authority of Singapore), and also pay the purchaser’s loan interest, loan cancellation charges and legal fees, capped at 5% of the Purchase Price.
- Vacant possession and liquidated damages: The 21-day vacant possession window now runs from the purchaser’s payment of the item 3 instalment and all other instalments outstanding at that time. Liquidated damages for late delivery accrue at 10% per annum from the “start date” on all Paid Amounts, which include the booking fee and any instalment paid after the “start date”.
- Completion: Completion now takes place 10 working days (previously 14 days) after the purchaser receives the Notice to Complete. The purchaser must deliver the transfer instrument within the same 10 working days.
- Area deficiency and title survey: The purchaser is now entitled to a price reduction for any area deficiency exceeding 2% (previously 3%). The Vendor now bears all title survey and certified plan costs. Under the previous Form 5, these costs were split between the Vendor (50%) and the purchasers by share value.
- Late payment interest and Base Rate: The calculation of late payment interest has been consolidated into a single clause (clause 6.1 of the SPA). Interest on late instalments is calculated on a daily basis at 2% per annum above the Base Rate, from the day after the due date for payment until the earlier of payment and the expiry of the 21-day repudiation notice period. Previously, the start date, the rate and the method of calculation were set out in three separate sub-clauses. The same formula, with an express start and end date, applies to interest on late maintenance charges (Form 5, clause 13.6), unpaid GST and refunds the Vendor fails to make after annulment. The Base Rate itself, which was previously the average of the prime lending rates of DBS, OCBC and UOB rounded down to the nearest one-eighth of 1%, is now the three-month compounded SORA (Singapore Overnight Rate Average) published by the Monetary Authority of Singapore. It is fixed half-yearly: the rate as of 1 March applies from 1 April to 30 September, and the rate as of 1 September applies from 1 October to 31 March. Developers’ interest calculators and demand letters will need updating.
- Handover deliverables and specifications: On handover, the Vendor must provide, free of charge, a drawn-to-scale as-built plan with the electricity, gas and plumbing layouts. Under Form 5, the Vendor must also provide BCA’s “Info-pack for Subsidiary Proprietors”. The Specifications must now state the specific finish, window and door type for each location (alternative materials may not be stated unless two finishes are actually provided), the type of locks, data points, and minimum ceiling heights based on the Approved Plans. Where a brand or model of sanitary fittings, air-conditioners or appliances is shown in brochures or show units, both that brand or model and the brand or model actually to be supplied must be stated. Form 5 also requires finishes for the common lift lobby, disclosure of PPVC (Prefabricated Prefinished Volumetric Construction), and an expanded list of recreational facilities.
- Maximum maintenance charges: For projects whose planning permission application is made on or after 1 June 2027, the OTP (clause 7.3) and Form 5 (clause 13.2) cap monthly maintenance charges at the per-share-value maximum rate approved by the Commissioner of Buildings. The existing wording (maintenance charges as approved by the Commissioner of Buildings) continues to apply to earlier projects.
Miscellaneous Provisions: What Goes Further
Forms 4 and 5 now incorporate an expanded set of miscellaneous provisions. Many reflect wording previously routinely approved by the COH on a project-by-project basis, which should reduce the need for bespoke approvals. However, developers should not assume that the new miscellaneous provisions can be used without amendments and should check that the provisions are suitable for each particular project and obtain the COH’s approval for amendments as required.
(C) Other Revisions Developers Should Note: Form 1, Form 3 and the HDR
Sales and Marketing Teams
- Advertisements: All advertisements must now state the lease commencement date and term (for leasehold land), the actual date of TOP (Temporary Occupation Permit) or CSC (Certificate of Statutory Completion) where already obtained, and the street name. Where unit layouts are shown, drawings of the approved balcony screens must be included. Sales brochures and developer websites must carry the prescribed track record statements (rule 3 HDR).
- Approved details only: An advertisement must not contain any statement, information, visual image or material about any part of the development unless all relevant authorities have approved that part (rule 6(2) HDR). The prohibition on false or misleading advertisements now expressly extends to visual images (rule 7 HDR).
- Booking fee and expressions of interest: The developer must require payment of the booking fee (5% to 10% of the price) before granting the OTP, and neither it nor its agents may give any benefit to offset the booking fee (rule 8 HDR). For rules 10 and 11, an “option” now includes any arrangement that grants a right to be given an option/OTP, which may catch expression-of-interest or priority-queue arrangements (rule 10(6) HDR).
- Form 1 register: The register of bookings must now record, for entity purchasers, the company registration number and place of incorporation, and, for all purchasers, nationality (by country), residency status and the date the purchaser signed the SPA.
- Track record: Developers must disclose (i) for the three years before the relevant licence date, any suspension of sale, any disqualification from Government Land Sales, and whether the project is subject to Tier 3 CONQUAS; and (ii) for the six years before that date, the number of housing projects completed, the number assigned CONQUAS Band 4, 5 or 6, and the number not assessed. Disclosure covers the developer, its directors, its substantial shareholders and their directors, and related corporations of the developer and of its substantial shareholders. The information must be consistent across Form 3, sales brochures and websites.
- Form 3 and other pre-booking items: Form 3 must include the lease commencement date and tenure, the reversionary owner and ground rent, a note on balcony enclosure, the share value and, for projects whose planning permission applications are made on or after 1 June 2027, the maximum maintenance charge rates. For strata units, the developer must also make available a drawn-to-scale floor plan of the relevant storey showing all communal facilities, which may be at the sales gallery or provided as a soft copy, and must notify the purchaser of the share value of the unit (rule 10(5) HDR).
Technical and Construction Teams
- Communal facilities plan: The former site plan is now a “communal facilities plan”. It must be based on all approved plans, must show (among other things) generators, lift motor rooms, water tanks, M&E (mechanical and electrical) rooms, refuse chute chambers, ventilation openings and shafts, car park ventilation shafts and pedestrian entrances, and must identify the storey on which each facility is located.
- Unit floor plans: Unit floor plans must show the location and number of air-conditioner condensers, label structural and non-structural walls, and show windows, door swing and slide positions, distribution boards, service pipes (exposed or boxed up), refuse chutes, built-in provisions and lofts. Landed homes now require a floor plan for each storey. These plans now form part of the contractual “Plans” under the SPA and any change requires the purchaser’s consent unless it is required by a new authority requirement.
- Maximum maintenance charges: For projects whose planning permission applications are made on or after 1 June 2027, the Commissioner of Buildings must approve the maximum maintenance charge before sales begin. Any upward revision requires the written consent of all purchasers, including sub-sale purchasers. The Building and Construction Authority has encouraged developers to build in buffers for cost increases.
Transitional Arrangements
The transitional rules now differ between Form 3 and the contract forms. The COH has clarified that the new Form 3 must be used for every Form 3 issued on or after 31 December 2026, for all ongoing and newly launched projects, regardless of whether any OTP in the project was issued before that date. This reflects the Amendment Rules: rule 12 preserves only the old Form 2 and the old Forms 4 and 5, and does not save the old Form 3. Where any OTP in a project was issued before 31 December 2026, the pre-amendment Forms 2, 4 and 5 continue to apply to all units in that project, including fresh SPAs for sub-sales under rule 16 HDR. All licensed developers must also comply with the other amended rules from 31 December 2026, whether or not OTPs were issued earlier.
Practical point: Ongoing projects will therefore operate on a hybrid basis from 31 December 2026: the new Form 3 must be paired with the old OTP and SPA. Developers in this position should note the following:
- Full new disclosures: For all units sold from 31 December 2026, the new Form 3 must include the track record information in Part G, the more detailed communal facilities and unit floor plans in Part B, the lease commencement date and tenure, the reversionary owner and ground rent, and the share value in Part H. Developers of ongoing projects, not only those launching projects after 31 December 2026, must prepare this material before that date.
- Disclosure without the new contractual consequences: The new Form 3 plans do not become contractual under the old SPA, because only the new SPA defines “Plans” to include the Floor Plan and Site Plan. Developers should nonetheless expect the more detailed plans to be relied on in any misrepresentation claim, and in practice should treat them as binding.
- Consistency between documents: Developers must ensure that the new Form 3, the old OTP and SPA, sales brochures and websites are consistent, particularly on the track record statements required by rule 3(1)(g) HDR.
(D) Executive Condominium Prescribed Forms
The amended HDR also applies to licensed developers of EC projects, and the EC OTP (Form 1) and SPA (Form 2) under the Executive Condominium Housing Scheme Regulations 2016 have been substantially aligned with the HDR forms. The EC forms mirror the HDR changes substantially. The transitional rule for the EC OTP and SPA is also the same. The new HDR Form 3 governs EC projects as well and the new Form 3 will apply to all EC options issued from 31 December 2026.
(E) Conclusion
The 2026 revisions are the most significant change to Singapore’s residential sales framework since 2016. They place real weight on pre-sale disclosure and move defects, plan compliance and compensation risk further onto developers. Consequential amendments have already been made to the Sale of Commercial Properties Rules for maximum maintenance charges, and we anticipate that the COH will next turn its attention to a wider revision of the prescribed forms and rules for the sale of commercial properties.
Developers launching projects on or after 31 December 2026 should start updating their sales documentation, plans and specifications now, and developers of ongoing projects should prepare the new Form 3 disclosures before that date. If you have any queries on the amended forms, the HDR or the EC regime, or would like assistance preparing for your next launch, please contact our team.
Annex: Eight Key Takeaways for Developers
- Check the transition date: From 31 December 2026, every project must use the new Form 3, including ongoing projects. Any OTP issued before 31 December 2026 keeps the whole project on the old Forms 2, 4 and 5. The amended HDR obligations nonetheless apply to all developers from that date.
- Advertise only approved details: Advertising content must reflect the approved plans, visuals included. Do not use “subject to change” disclaimers.
- Prepare track record disclosures: Compile the CONQUAS, suspension and Government Land Sales disqualification data for all relevant persons, and keep it consistent across Form 3, brochures and websites.
- Treat pre-sale plans as contractual: The Floor Plan and Site Plan given to buyers now expressly bind the developer.
- Plan for a longer common property DLP: Hold the first AGM promptly. The 5% retention is now released only when the Common Property DLP expires.
- Budget for new costs: The Vendor bears all title survey costs, and the area deficiency threshold falls to 2%. Annulment following objections to substantive changes to key common or limited common property facilities under clause 14 of the SPA also requires reimbursement of loan interest, cancellation charges and legal fees, capped at 5% of the Purchase Price.
- Specify precisely: State one finish per location, and state both the brand shown and the brand to be supplied for fittings and appliances displayed in brochures or show units.
- Set maximum maintenance charges carefully: For projects whose planning permission applications are made on or after 1 June 2027, the approved maximum maintenance charge is binding, and any upward revision needs the consent of every purchaser.
For regional Real Estate matters, please see Rajah & Tann Asia’s Real Estate Practice for more information.
Disclaimer
Rajah & Tann Asia is a network of member firms with local legal practices in Cambodia, Indonesia, Lao PDR, Malaysia, Myanmar, the Philippines, Singapore, Thailand and Vietnam. Our Asian network also includes our regional office in China as well as regional desks focused on Brunei, Japan and South Asia. Member firms are independently constituted and regulated in accordance with relevant local requirements.
The contents of this publication are owned by Rajah & Tann Asia together with each of its member firms and are subject to all relevant protection (including but not limited to copyright protection) under the laws of each of the countries where the member firm operates and, through international treaties, other countries. No part of this publication may be reproduced, licensed, sold, published, transmitted, modified, adapted, publicly displayed, broadcast (including storage in any medium by electronic means whether or not transiently for any purpose save as permitted herein) without the prior written permission of Rajah & Tann Asia or its respective member firms.
Please note also that whilst the information in this publication is correct to the best of our knowledge and belief at the time of writing, it is only intended to provide a general guide to the subject matter and should not be treated as legal advice or a substitute for specific professional advice for any particular course of action as such information may not suit your specific business and operational requirements. You should seek legal advice for your specific situation. In addition, the information in this publication does not create any relationship, whether legally binding or otherwise. Rajah & Tann Asia and its member firms do not accept, and fully disclaim, responsibility for any loss or damage which may result from accessing or relying on the information in this publication.